Select Page
LNG Regasification

The liquefaction and regasification process plays a key role within the LNG (LNG = Liquefied Natural Gas) value chain. For the liquefaction, the natural gas needs to be cooled down to approximately -164°C. LNG has a volume of about 600 times less than natural gas and can therefore be stored and transported very efficiently. The regasification takes place either on land, or water in a so-called “FSRU” (Floating Storage and Regasification Unit); in both cases, requiring a considerable input of heat. State of the art LNG vaporizer systems use seawater as the heat source. In order to ensure efficient and uninterrupted operation of the heat exchanger and vaporizer cycle, it is necessary to install a reliable and proven seawater filter upstream of the heat exchanger. Based on a large number of references SAB has gained many years of experience for this application.

Reliable protection of heat exchangers
Elimination of algae and other microorganisms
Compact design
Reduced maintenance cost and downtime

GEORG SCHÜNEMANN GMBH

BUNTENTORSDEICH 1

28201 BREMEN

info@sab-bremen.de

Tel.: +49(0)421-5 59 09-0

Fax: +49(0)421-5 59 09-40

SPONSORSHIP

 

 

Cookie-Einstellungen
Auf dieser Website werden Cookie verwendet. Diese werden für den Betrieb der Website benötigt oder helfen uns dabei, die Website zu verbessern.
Alle Cookies zulassen
Auswahl speichern
Individuelle Einstellungen
Individuelle Einstellungen
Dies ist eine Übersicht aller Cookies, die auf der Website verwendet werden. Sie haben die Möglichkeit, individuelle Cookie-Einstellungen vorzunehmen. Geben Sie einzelnen Cookies oder ganzen Gruppen Ihre Einwilligung. Essentielle Cookies lassen sich nicht deaktivieren.
Speichern
Abbrechen